Kip Inc. Wins Ventura Drain Repair Contract
- Share via
KIP Inc. in Murrieta has been awarded a $1.36-million contract from Ventura County to repair the Ondulando Drain in Ventura. The project is designed to relieve flooding at the intersection of Via Baja and Via Arroyo, lower the annual maintenance cost and stop bank erosion along the existing right of way.
Work on the project, which will stretch about 100 feet from where the drain meets Harmon Barranca to the Via Arroyo and Via Baja intersection, is scheduled to begin today and continue until Aug. 3.
More to Read
Inside the business of entertainment
The Wide Shot brings you news, analysis and insights on everything from streaming wars to production — and what it all means for the future.
You may occasionally receive promotional content from the Los Angeles Times.